MTV11001/1 – lubricant for cable installation into microducts
Application
- Clean and dry the tubing by blowing a tight-fitting foam sponge through the microduct with high pressure. If excess water or dirt comes from the microduct, repeat the process. Trapped water can block the airflow.
- Shake the bottle before use.
- Squeeze the recommended amount of lubricant into microduct. Quantity can be measured with a syringe or estimated based on duct fill length (table below).
- Spread lubricant by blowing a foam carrier or sponge through the microduct as many times as necessary to avoid puddling at the front of the duct.
- Allow the duct lubricant to dry out completely by blowing in air for at least 5 minutes.
Tube size OD/ID | Lubricant per km, duct, volume required | Microduct fill length |
16/12 mm | 15 ml | 13 cm |
16/10, 14/10, 12/10 mm | 12 ml | 15 cm |
10/8 mm | 10 ml | 20 cm |
10/6, 8/6 mm | 7 ml | 26 cm |
7/5 mm | 6 ml | 30 cm |
7/3.5, 5/3.5 mm | 5 ml | 44 cm |
Safety Data Sheet
Access the Safety Data Sheet (SDS) here.