Skip to main content
Home / Instructions and guides / Instruction – MTV11001/1
Products_HCI_Viper-Venom-in-action

Instruction – MTV11001/1

MTV11001/1 – lubricant for cable installation into microducts

MTV11001-1-Lubricant-for-Cable-Installation.jpg

Application

  1. Clean and dry the tubing by blowing a tight-fitting foam sponge through the microduct with high pressure. If excess water or dirt comes from the microduct, repeat the process. Trapped water can block the airflow.

  2. Shake the bottle before use.

  3. Squeeze the recommended amount of lubricant into microduct. Quantity can be measured with a syringe or estimated based on duct fill length (table below).

  4. Spread lubricant by blowing a foam carrier or sponge through the microduct as many times as necessary to avoid puddling at the front of the duct.

  5. Allow the duct lubricant to dry out completely by blowing in air for at least 5 minutes.
Tube size OD/ID Lubricant per km, duct, volume required Microduct fill length
16/12 mm 15 ml 13 cm
16/10, 14/10, 12/10 mm 12 ml 15 cm
10/8 mm 10 ml 20 cm
10/6, 8/6 mm 7 ml 26 cm
7/5 mm 6 ml 30 cm
7/3.5, 5/3.5 mm 5 ml 44 cm

 

Safety Data Sheet

Access the Safety Data Sheet (SDS) here.